Defcon 5
|
 |
« on: September 21, 2007, 05:12:51 am » |
|
a turbine can be manufactured easily allowing them to mass produce them. a power plant is easily built takes thousands of workers to build the damn thing, then after that you will still be employing thousands of people to maintain the power plant.
The estimate for the first power station is to be built in 2017 and the whole fleet of nuclear powerstations they want to build will be completed in 2030 but only filling 3.6% are you kidding me? So are you saying that is good! 2017 we could have thousands of turbines producing tonnes more power than that.
in Dubai they are constructing a floating island which will contain a mass of solar panels which i believe is around half a mile, solar panels are now becoming much more sophisticated and they have realised that do you see them having plans for more nuclear power stations and they are a very popular place!
|
|
|
|
|
|
|
|